Now that the scaffolding has been removed, machinery can be introduced to the site to dig trenches for service drains around the house. Connections will be made to the local sewer drain, electrical and water provider, and the storm-water will be drained to a collection tank for use on-site. The drain trenches are machine dug where possible, and once the pipework is laid, scoria is placed into...
Thursday, June 14, 2012
Friday, June 1, 2012

Previous posts on the elements that form the building envelope, have shown Intello humidity variable airtightness membranes. The management of the membrane has needed to be considered to position it in the correct place on the inner face of the construction. Once the insulation is all in place, the membrane is taped sealing all joins. Once complete, the building is...