• FOOTING FORMWORK

    As well as providing insulation to separate the concrete structure from the ground (preventing thermal bridging) 'Eco-block' foam insulation creates the formwork for the insitu concrete strip footings, and concrete floor slab edge. 'Eco-block' is an insulated concrete form (ECF) made from expanded...
  • THE FINAL STAGE

    The Owners have now moved into the house.  Landscaping is underway, and finishing touches within the house continue.  Joinery fitments, electrical and sanitary fitments have been installed.  The blog will continue, but with less frequent entries....
  • RAINWATER COLLECTION

    Rainwater is collected from the roof, via spouting / guttering which discharges into vertical downpipes that are run to storage tanks supplied by 'Marley'.  'Marley' diverters to prevent the ingress of debris that may be collected along the way, are fixed to outlets in the downpipe prior to...
  • WIRING

    Wiring for the house is being threaded through walls and ceilings to facilitate the needs for each space / room.  The wires are taped to the surface they protrude through to ensure airtightness is not compromised. The wiring boxes are set...
  • MEMBRANE ROOF

    The roof for the garage at the street end of the PH is a flat roof that will incorporate an insulating layer laid beneath the roofing membrane.  The roofing membrame consists of a base-sheet layer of Nuraply 3PV-SA which is fixed over the insulation. This sheet is designed specifically...
  • INSULATION

    R4.0 'Pink Batts' fibreglass wool  insulation is placed between the roof framing throughout the house, with straps stapled to the timber framing to secure the blankets in place.strapped into position. Once this layer of insulation is...
  • FOOTING FORMWORK

    As well as providing insulation to separate the concrete structure from the ground (preventing thermal bridging) 'Eco-block' foam insulation creates the formwork for the insitu concrete strip footings, and concrete floor slab edge. 'Eco-block' is an insulated concrete form (ECF) made from expanded...
  • THE FINAL STAGE

    The Owners have now moved into the house.  Landscaping is underway, and finishing touches within the house continue.  Joinery fitments, electrical and sanitary fitments have been installed.  The blog will continue, but with less frequent entries....