The New Zealand's First Passive House
Showing posts with label Concrete floors. Show all posts
Showing posts with label Concrete floors. Show all posts
Tuesday, January 10, 2012

CONCRETE FLOOR SLAB - SECOND POUR

›
In January, the second concrete floor slab was poured for the majority of the house footprint.   Using the same construction as the first fl...
38 comments:
Friday, December 9, 2011

FLOOR SLAB - FIRST POUR

›
The lower level floors of the house are concrete.  'Eurosteel' reinforcing bars connect from the footings, as well as the insitu con...
10 comments:
›
Home
View web version
Powered by Blogger.